Familiarisation
FAMILIARISATION:
The following familiarisation items are required for Engineers before taking over a watch:-
1. Engine Room Familiarisation/Machinery Check List.
2. Chief Engineer's Standing Orders.
3. Engine related procedures, check lists and manuals.
4. Equipment and controls in machinery spaces.
5. Operation controls of Emergency systems.
6. Main Engine emergency controls and stops.
7. Boiler controls and emergency procedures.
8. Auxiliary Engine controls and emergency stops.
9. Fuel and Lubrication oil pump emergency stops and quick closing valve.
10. Bilge and ballast systems.
11. Fire alarms and equipment.
12. Emergency escapes routes.
13. Other emergency control systems or measures.
Other important items
Preparation and anticipation of Port State Control Inspections.
Please be reminded that The Engine Log Book to be kept clean and tidy and all entries to be
neatly written.
Any mistakes or correction as when require to be made by a slim line and corrected parameter to
be initiated with a small signature.
Engine room floor plates to be oil free and dry at all times/Arrange for cleaning
Comments
Post a Comment